Architectural
Services |
Request Architectural Services
The following is a listing of the basic services that can be provided to you.
Architectural differences between building structures include:
(1)
Contemporary,
(2) English,
(3) French provincial,
(4) Ranch,
(5) Spanish,
(6) Modern
(7)
Monterey, and
(8)
Victorian style homes.
Phase I - Preliminary Design
(1) Preliminary Consultation
(2) Feasibility Study
- summarizes your growth potential and your financial capability, and makes
recommendations for both short term and long term needs.
(3) Design Meetings
with Building Committee
(4) Long Range Master
Planning
(5) Building Code Research,
and Coordination with Existing Facilities
(6) Review and Revision
to Client Satisfaction
(7) Coordination of
Design Progress with Financial Planning
(8) Congregational
Presentation
(9) Also where applicable:
(10) Assistance in
Site Selection
Phase II - Construction Documents
State of the art computer aided design and drafting systems allow our architects and draftsmen to produce a thorough, accurate, extensively detailed set of plans and specifications. The result is higher quality and better cost containment in construction.
Site Plan
Audio/Visual Engineers
Complete Specifications
Floor Plans and Elevations
Building Sections and Details
Code Analysis
for all Applicable Codes
Room Finish, Window, and Door Schedules
Structural, Plumbing, HVAC, and Electrical Engineering
Phase III - Construction Observation
or Construction Management
(1) After Phase I (Preliminary Design), and
(2) Phase II (Construction Documents) are complete, a site can choose to proceed with either Construction Observation services or Construction Management services.
Construction Observation
In Office:
Review Materials, Request
for Substitutions, Approve Shop Drawings
Prepare Supplementary Drawings, as needed, to Clarify Intent of Construction
Drawings Evaluate Contractor Requests for Credits and/or Extras for Change
Orders
On Site Responsibilities
Place a qualified Superintendent on the job full time. Remain available to Site and Superintendent to answer construction questions.
Approve shop drawings and review any request for material substitution and secure bids from Subcontractors and Material Suppliers.
Meet with the Building Committee Chairman periodically to review progress of construction. Make final walk-through inspection with Superintendent and Site.
Present construction cost estimate (construction budget) to Site's.
Develop a Critical Path Schedule to be followed by the Superintendent.
Generate Purchase and
Work Orders to Suppliers and Subcontractors.
Generate Lien Waivers for each payment made to Subcontractors and Vendors.
Utilize Value Engineering to bring costs within Site's budget.
Make regular site (Architectural/Construction
Management) visits to ensure compliance with Construction Drawings to assure
quality.
B. Site's Responsibilities / Actions:
Act as the General (Owner/Builder) Contractor. Appoint a responsible neutral party (Escrow Coordinator) to Close and Fund Transaction. We Hire and Control:
(1) Subcontractors,
(2) Suppliers, and
(3) Materials used for the job.